欧美一区二区三区大屁股-亚洲欧美精品中文一区二区三-成人黄色片久久久大全-最新亚洲av日韩av二区五区

The first section of the first tower crane was shipped smoothly
Release Time:2024-02-19      Author:      Pageviews:2351

191708348082102910.png

On the afternoon of February 19th, firecrackers sounded at the delivery square of Jingwei Industrial Park of Shaanxi Construction Machinery Co., Ltd. At the order of He Weidong, deputy general manager of Shaanxi Construction Machinery Corporation, three transport vehicles loaded with STC250 tower cranes slowly drove out of the factory gate and delivered to users. This is the company started to ship the first tower crane after the Spring Festival.

STC250 Tower crane is a horizontal crane, car amplitude, jack-up flat head tower crane, tower body equipped with 2m fishtail plate plate standard section, lifting, rotation, amplitude three institutions are using full frequency conversion speed regulation, electronic control system intelligent detection and protection, excellent control performance, can meet a total of 17 arm length combination of 30~70m. Equipped with a comfortable operation of the integrated wide-body cab, the whole machine performance is strong, to meet customer needs.